Senior-most technical leader for every module that leaves the Austin factory floor, at the point where designs become hardware. From the close of Preliminary Design through Factory Acceptance Testing and shipment to site, accountable for every reactor module delivered, every drawing released for manufacturing, and the technical content of the FSAR (NRC) or DSA (DOE) safety submittal.