Factory openingapprovedJuly 10, 2026
Boeing
737 North Line opens in Everett
Boeing opened a fourth 737 production line in Everett, Washington, beginning the first 737 builds outside Renton in more than 50 years.
Boeing opened the 737 North Line inside its Everett complex and started the first 737 MAX build at the site. The line initially focuses on the 737-8, -9, and -10 and begins with low-rate initial production. Backed by a $1 billion site investment, it is intended to add production resilience and help Boeing move from 47 to an eventual 52 airplanes per month across the program.
Headline metrics
| Site investment | $1B | |
| Program line | 4th | 737 production line |
| Planned rate | 52 / month | eventual program capacity |
Highlights
- Everett firstThe first 737 production outside Renton in more than five decades.
- Flexible mixThe line is configured for the 737-8, 737-9, and 737-10.
- Production resilienceA fourth line adds capacity and reduces reliance on a single production location.
Resources
- Boeing North Line openingboeing.com
- Boeing investment and rate detailsboeing.com