Curated link

Anduril's new manufacturing campus cannot wait for the grid

A 25-megawatt bridge-power system will pair utility service with 60 megawatt-hours of batteries so a six-building California factory complex can open before permanent upgrades arrive.

BG
By Bryan Gottlieb
October 28, 2026 · via Engineering News-Record
Published elsewhere

Read it on Engineering News-Record.

We linked this piece because it belongs in the record of the movement. Click through to read it at the source.

Filed under#defense-industrial-base#manufacturing#energy-infrastructure#california
← Back to ShowcaseSubmit your own