Curated link

Aging-grid replacement is sustaining WSP's U.S. infrastructure backlog

Transmission, substation, and power-system modernization demand remains strong even as project authorizations slow and the data-center boom faces public resistance.

MT
By Matthew Thibault
November 6, 2026 · via Construction Dive
Published elsewhere

Read it on Construction Dive.

We linked this piece because it belongs in the record of the movement. Click through to read it at the source.

Filed under#grid-infrastructure#transmission#substations#construction#industrial-capacity
← Back to ShowcaseSubmit your own